London Eye ‘future proofed’ for £12.5 million
Environmentally friendly and technologically advanced capsules for London 2012 and beyond.

The London Eye will benefit from a 12.5 million investment boost to keep it future proofed' for the next 15 to 20 years.
Each London Eye capsule will benefit from an updated heating and ventilation system that is much more environmentally friendly than the current tech in use.
However, one capsule will be fitted with advanced technology, which all the other capsules will support in the future.
This includes four ceiling mounted screens, enhanced multimedia, in addition to Wi-Fi capabilities allowing the capsule to provide music and on-screen visuals to the attraction's visitors.
Each of the 32 capsules will be removed and upgraded one at a time so as not to interrupt normal operations. The plan is to complete the overhaul in time for the London Olympics in 2012.
"This will ensure the London Eye operates at maximum efficiency and is cutting down its carbon footprint well into the future," said David Sharpe, a director at Merlin Entertainments Group, which owns the London Eye.
Get the ITPro daily newsletter
Sign up today and you will receive a free copy of our Future Focus 2025 report - the leading guidance on AI, cybersecurity and other IT challenges as per 700+ senior executives
-
Asus ZenScreen Fold OLED MQ17QH review
Reviews A stunning foldable 17.3in OLED display – but it's too expensive to be anything more than a thrilling tech demo
By Sasha Muller
-
How the UK MoJ achieved secure networks for prisons and offices with Palo Alto Networks
Case study Adopting zero trust is a necessity when your own users are trying to launch cyber attacks
By Rory Bathgate