British Gas launches trial scheme to reuse waste heat from data processing – and it involves installing a tiny ‘virtual data center’ in homes
The system involves processing data within people's homes and channeling the heat into hot water cylinders


British Gas is carrying out a trial using excess heat from data processing to provide free hot water in homes.
The company has signed a deal with sustainable cloud business heata that will see the heat generated by corporate data processing channeled directly into hot water cylinder in the home.
Not only could this cut heating costs for homeowners, British Gas said it also avoids the need for energy-intensive cooling in the data center.
The system works through a small compute unit that's attached to the resident's hot water cylinder. This works as a tiny 'virtual data center', processing data for cloud computing customers while providing free hot water for the homeowner.
Each heata unit can provide up to 4kWh of hot water per day, according to the company.
British Gas has now officially launched the trial scheme, running its own data processing workloads on the heata units in ten employees' homes.
"Waste heat is a big problem for data centers, leading to significant energy costs for cooling. Yet heat is valuable. On the other side of the coin you have an energy crisis and people struggling to heat their homes," said Chris Jordan, co-founder of heata.
Get the ITPro daily newsletter
Sign up today and you will receive a free copy of our Future Focus 2025 report - the leading guidance on AI, cybersecurity and other IT challenges as per 700+ senior executives
"British Gas launching this trial is a huge step and we would love to see other firms following their lead. Being able to say you have reduced your compute carbon footprint and provided free hot water to people during an energy crisis is hugely powerful for companies who take pride in their sustainability and social impact."
Operators are cutting down on data center waste heat
While this is a tiny trial project, there are increasing moves to use the waste heat from data centers to power homes.
The first large-scale scheme in the UK kicked off at the end of 2023 in the London boroughs of Hammersmith and Fulham, Brent, and Ealing, serving 10,000 new homes and 250,000m2 of commercial space, as well as a hospital.
"Recycling the huge amounts of wasted heat from our local data centers into heat and energy for local residents, a major hospital and other users is an exciting and innovative example of OPDC’s support for the mayor’s net zero ambitions," said David Lunts, chief executive of the Old Oak and Park Royal Development Corporation (OPDC).
A report last year from techUK said the concept of data center heat reuse had significant promise, but identified a number of problems, including seasonal fluctuations and variable energy demand.
RELATED WHITEPAPER
Meanwhile, new data centers take a while to fill, and operators have limited control over external factors such as occupancy levels. This, techUK noted, means that relying on exporting the majority of the available heat based on the maximum projected IT load carries a significant risk.
The report recommended that data centers should look to reduce their energy consumption before implementing heat reuse.
MORE FROM ITPRO
- Inside Google’s plan to use data center waste heat to warm nearby homes and businesses
- New East London data center proposals include plans to use waste heat for local homes
- Microsoft's new data center will heat homes and businesses in Finland
Emma Woollacott is a freelance journalist writing for publications including the BBC, Private Eye, Forbes, Raconteur and specialist technology titles.
-
Bigger salaries, more burnout: Is the CISO role in crisis?
In-depth CISOs are more stressed than ever before – but why is this and what can be done?
By Kate O'Flaherty Published
-
Cheap cyber crime kits can be bought on the dark web for less than $25
News Research from NordVPN shows phishing kits are now widely available on the dark web and via messaging apps like Telegram, and are often selling for less than $25.
By Emma Woollacott Published
-
The foundation of data center modernization
Whitepaper Choosing the right processor is more important than ever
By ITPro Published
-
Winning the data-centric digital business in this decade
Whitepaper Discover more about Dell’s adaptive, secure, and resilient portfolio for the digital business and win in this data-centric era
By ITPro Published
-
Data centres that switch from HDDs to SSDs use 70% less power
News This is part of Huawei’s strategy to help data centres go green through data storage
By Zach Marzouk Published
-
In unpredictable times, a data strategy is key
Whitepaper Data processes are crucial to guide decisions and drive business growth
By ITPro Published
-
Building a winning data strategy
Whitepaper Get serious about data and data science
By ITPro Published
-
Nvidia data centre revenues up 79% for Q1
News Increase partly attributed to its 2019 acquisition of Israeli-American datacentre specialists Mellanox
By Bobby Hellard Published
-
Samsung unveils 512GB DDR5 DRAM for high-performance computing
News The advanced memory comprises eight layers of 16GB units built using the HKMG fabrication process
By Keumars Afifi-Sabet Published
-
AWS ditches Nvidia for in-house 'Inferentia' silicon
News Alexa queries and facial recognition data will now be processed by Amazon's own chips
By Bobby Hellard Published